Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Finished SDSU reruns
+
* Finished hypocenter clean-up
** Posted SDSU results, sent link to JB, CG for download
+
* Fixed UCSB unit test for rupture generator
** Created plots for latest SDSU results
+
* Started NGAE October 2014 study/release wiki page
* Posted all NGA-E results on hypocenter for CG download
+
* Received KA package for BBP post-processing from CG
* Continued cleaning up on hypocenter drive (back after repair)
+
* BBP planning meeting with PM
* BBP call
+
* Tested BBP image from Phil
* Sent follow-up e-mails
+
** Ran simulation, no problems
** JC, RA regarding data availability
 
** JC, RA regarding parameters for 14.11 release
 
** CG regarding tar files
 
  
 
== Today ==
 
== Today ==
  
* Finalize hypocenter clean-up
+
* Finish NGA-E page
* Work on open trac tickets
+
** Summary of scenarios, runs
** # 281 - label in development methods
+
** BBP distribution with source package + East GFs + East validation events
** # 277 - copy src file to outdata
+
* Start BBP Release plan wiki page
** # 276 - add random seed in html index file
 
** # 269 - First BBP simulations
 
* Update unit and acceptance tests on BBP
 
* Close trac tickets regarding software updates
 
** # 280 - Calculate DX/DY automatically for GP method
 
** # 282 - SDSU fix for d>70km
 
** # 271 - UCSB code integration
 
** # 270 - Fix headers in rd50 files
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 31: Line 20:
  
 
== Followups: ==
 
== Followups: ==
* BBP follow-up with Phil @ 1:30pm
+
* High-F call at 11am

Revision as of 17:09, 21 October 2014

Yesterday

  • Finished hypocenter clean-up
  • Fixed UCSB unit test for rupture generator
  • Started NGAE October 2014 study/release wiki page
  • Received KA package for BBP post-processing from CG
  • BBP planning meeting with PM
  • Tested BBP image from Phil
    • Ran simulation, no problems

Today

  • Finish NGA-E page
    • Summary of scenarios, runs
    • BBP distribution with source package + East GFs + East validation events
  • Start BBP Release plan wiki page

Blocked:

  • No

Followups:

  • High-F call at 11am