Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*HighF meeting
+
*Finished verification 0.5 Hz workflow on Titan, results match
*CyberShake meetings - move ahead with new 1 Hz sites
+
*Queued full-scale 0.5 Hz workflow with SeisPSA code with RotD options on Blue Waters; ran into some small issues, resolved
*UCVM meeting
+
*Queued test of random vs uniform hypocenters
*Committed edits to UCVM paper
+
*Queue up 1 Hz SGTs on Titan for PAS, SBSM
  
 
== Today ==
 
== Today ==
*Run full-scale workflow with SeisPSA code with RotD options on Blue Waters
+
*Modify Titan workflows to abort if not enough walltime remaining
*Finish verification workflow on Titan
+
*Generate estimate of single pilot job size for Titan workflow
*Queue up SGTs on Titan for LADT, PAS, SBSM
+
*Monitor full-scale 0.5Hz workflow test on Blue Waters
*Run test of random vs uniform hypocenters
+
*Monitor random vs uniform hypocenter test
 +
*Monitor Titan 1 Hz SGTs for PAS, SBSM
  
 
== Blocked ==
 
== Blocked ==

Revision as of 18:05, 10 November 2014

Yesterday

  • Finished verification 0.5 Hz workflow on Titan, results match
  • Queued full-scale 0.5 Hz workflow with SeisPSA code with RotD options on Blue Waters; ran into some small issues, resolved
  • Queued test of random vs uniform hypocenters
  • Queue up 1 Hz SGTs on Titan for PAS, SBSM

Today

  • Modify Titan workflows to abort if not enough walltime remaining
  • Generate estimate of single pilot job size for Titan workflow
  • Monitor full-scale 0.5Hz workflow test on Blue Waters
  • Monitor random vs uniform hypocenter test
  • Monitor Titan 1 Hz SGTs for PAS, SBSM

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration