Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Resumed site with RotD insertions
+
*Call with CB
*Finished restart verification
+
*Continued insertion and curve calc of RotD for Study 14.2
*Tested UCVM install on Titan, looks good
+
*Plotted spectral content of seismograms for filtering comparison
*Ran into problems with SGT header generation on Titan
+
*Emailed with Kim to determine impact of FP on seismograms
*Changed DirectSynth to group data intended for the same file
+
*Testing of 1 Hz workflows on Blue Waters
 +
*Problem with serial I/O on Titan continues
  
 
== Today ==
 
== Today ==
*Debug issue with SGT header generation
+
*Monitor RotD insertion and calc
*Resume 1 Hz test
+
*Continued testing of 1 Hz workflows on Blue Waters
*Test file groups in DirectSynth
+
*Create MPI version of SGT header code to work around serial I/O problems
 
+
*Finish new 1 Hz WNGC test
  
 
== Blocked ==
 
== Blocked ==
Line 16: Line 17:
  
 
== Follow-ups ==
 
== Follow-ups ==
*CyberShake calls
+
*possibly with Phil
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:17, 16 March 2015

Yesterday

  • Call with CB
  • Continued insertion and curve calc of RotD for Study 14.2
  • Plotted spectral content of seismograms for filtering comparison
  • Emailed with Kim to determine impact of FP on seismograms
  • Testing of 1 Hz workflows on Blue Waters
  • Problem with serial I/O on Titan continues

Today

  • Monitor RotD insertion and calc
  • Continued testing of 1 Hz workflows on Blue Waters
  • Create MPI version of SGT header code to work around serial I/O problems
  • Finish new 1 Hz WNGC test

Blocked

  • No

Follow-ups

  • possibly with Phil

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration