Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Modified Anderson GoF Code |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
** Enabled plotting | ** Enabled plotting | ||
− | ** Format improvements | + | ** Format improvements (Pylint -21.56 to 8.50) |
+ | ** Packaging code into BBP module | ||
+ | * Tested BW login on portal | ||
+ | * Checked with KO and RT about SDSU code | ||
== Today == | == Today == | ||
− | * | + | * Complete Anderson GoF Code changes |
− | ** | + | ** Make it a BBP module |
− | + | * Send code back to AS for continued development | |
− | + | ** Call with AS | |
== Blocked: == | == Blocked: == | ||
Line 25: | Line 21: | ||
== Followups: == | == Followups: == | ||
+ | * Call with AS (TBD) | ||
* Task priorities with PM (TBD) | * Task priorities with PM (TBD) | ||
Revision as of 17:04, 8 June 2015
Contents
Yesterday
- Modified Anderson GoF Code
- Enabled plotting
- Format improvements (Pylint -21.56 to 8.50)
- Packaging code into BBP module
- Tested BW login on portal
- Checked with KO and RT about SDSU code
Today
- Complete Anderson GoF Code changes
- Make it a BBP module
- Send code back to AS for continued development
- Call with AS
Blocked:
- No
Followups:
- Call with AS (TBD)
- Task priorities with PM (TBD)
To Do:
Short Term
Broadband Platform
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method