== Yesterday ==
 
== Yesterday ==
  
* Updated OS X Guide to include unit and acceptance test sample output
+
* Installed UCVM on BW
* Ran updated Anderson GOF code to test modifications
+
** Passed all tests
* Send SG e-mail regarding availability of rupture generator code
+
* Looked into RG's new rupture generator
** Waiting for response
+
** New parameters from Rob
* EEW laptop to JY
+
* Got EEW laptop back from JY
* Permission to restart wiki
+
* Ran NGA-West-2 test
* BBP server update
+
** Results not matching yet, testing code needs refinement
** Update OS and Python installation
+
* Contacted SG regarding rupture generator code
  
 
== Today ==
 
== Today ==
  
* Run NGA-West 2 tests
+
* Update Trac site with new codes/tasks
** Produce comparison tables against OpenSHA results
+
* Run revised NGA-West 2 testing
* Try UCVM on BW
+
* Run UCVM 'ucvm2mesh-mpi' tool on BW
* Look at RG's new rupture generator code
+
* Run SG's code
 +
* Try RG's new rupture generator code
  
 
== Blocked: ==
 
== Blocked: ==
  
* Waiting for SG's response
+
* No
  
 
== Followups: ==
 
== Followups: ==

Revision as of 17:10, 15 June 2015

Yesterday

  • Installed UCVM on BW
    • Passed all tests
  • Looked into RG's new rupture generator
    • New parameters from Rob
  • Got EEW laptop back from JY
  • Ran NGA-West-2 test
    • Results not matching yet, testing code needs refinement
  • Contacted SG regarding rupture generator code

Today

  • Update Trac site with new codes/tasks
  • Run revised NGA-West 2 testing
  • Run UCVM 'ucvm2mesh-mpi' tool on BW
  • Run SG's code
  • Try RG's new rupture generator code

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method