Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 9: | Line 9: | ||
** libraries, jbsim | ** libraries, jbsim | ||
* Sent SRF plots to PM | * Sent SRF plots to PM | ||
+ | * BBP new disk hasn't arrived yet | ||
+ | ** BBP update postponed | ||
== Today == | == Today == |
Revision as of 17:01, 18 June 2015
Contents
Yesterday
- Ran UCVM on BW again
- cvms 4.26 500 cores, larger region with 0 rotation
- Worked with DG for adding metadata, adjusting coordinates
- Created new netcdf file
- Loaded it into IRIS visualization tool
- Updated GP method
- libraries, jbsim
- Sent SRF plots to PM
- BBP new disk hasn't arrived yet
- BBP update postponed
Today
- Run revised NGA-West 2 testing
- Look into SG's code parameters
- Try to see which ones come from SRC file
- Which other ones are needed...
- Try RG's new rupture generator code and LF simulator
- HPCC Part-A and Part-B
- Return EEW computer to JY
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method