Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
7/28/15
+
8/3/15
  
 
== Yesterday: ==
 
== Yesterday: ==
* listened in on Project 17 call
+
* did spectral analysis on UCERF3-TD based synthetic catalogs
* exported simulator moment rate time series to matlab for spectral analysis
+
* helped Ned speed up ETAS diagnostics code by ignoring contribution below a fractional threshold
* re-read notes from my data analysis class on spectral analysis
+
* finished directivity model validation and regenerated CyberShake-OEF maps
* generated FFT amplitude and Welch's power spectrum plots for simulator data which show that the observed 200 year periodicity in moment rate is not an artifact of the moment rate averaging method
 
  
 
== Today: ==
 
== Today: ==
* meet with Tom on simulator moment rate analysis and potential AGU abstract
+
* pick AGU session and write first draft of abstract, send to Tom
* read papers on synchronization from Tom
+
* run simulator synchronization analysis on UCERF3-TD catalog
** implement new simulator synchronization plot method that Tom found
+
** will require code rewrites to make synch code more general, get UCERF3 data into format which will work for simulators
* generate synthetic UCERF3-TD based catalogs and apply moment rate spectral analysis to compare with simulator
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 18: Line 16:
 
== Followups: ==
 
== Followups: ==
 
no
 
no
 
  
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
 
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
 
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)

Revision as of 17:07, 3 August 2015

8/3/15

Yesterday:

  • did spectral analysis on UCERF3-TD based synthetic catalogs
  • helped Ned speed up ETAS diagnostics code by ignoring contribution below a fractional threshold
  • finished directivity model validation and regenerated CyberShake-OEF maps

Today:

  • pick AGU session and write first draft of abstract, send to Tom
  • run simulator synchronization analysis on UCERF3-TD catalog
    • will require code rewrites to make synch code more general, get UCERF3 data into format which will work for simulators

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)