Difference between revisions of "Staff Priorities - Kevin"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
− | 8/ | + | 8/4/15 |
== Yesterday: == | == Yesterday: == | ||
− | * | + | * first draft of supercycle AGU abstract, sent to Tom |
− | + | * got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis | |
− | * | + | * worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots |
== Today: == | == Today: == | ||
− | * | + | * finalize AGU abstract with Tom, submit |
− | * | + | * register for SCEC annual meeting |
− | * | + | * finish recurrence plot rotation work, make plots for UCERF3-TD |
== Blocked: == | == Blocked: == | ||
Line 15: | Line 15: | ||
== Followups: == | == Followups: == | ||
− | + | * broadband cybershake call at 11:30 | |
== Lower priority or longer term tasks == | == Lower priority or longer term tasks == | ||
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m) | * Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m) |
Revision as of 17:25, 4 August 2015
8/4/15
Yesterday:
- first draft of supercycle AGU abstract, sent to Tom
- got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis
- worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots
Today:
- finalize AGU abstract with Tom, submit
- register for SCEC annual meeting
- finish recurrence plot rotation work, make plots for UCERF3-TD
Blocked:
no
Followups:
- broadband cybershake call at 11:30
Lower priority or longer term tasks
- Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)