Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Integrated wcc_siteamp14 into BB CyberShake, passed test
+
*Finished DAX generator for BB CyberShake
*Resubmitted pegasus-statistics, worked through a few issues with Karan
+
*Created script to run DAX generator and interface with runs
*DB engine change completed overnight
 
*Started code to grab Vs30 from UCVM for high-frequency CyberShake
 
  
 
== Today ==
 
== Today ==
*Finish Vs30 code, verify
+
*Start testing BB CyberShake workflows
*Add loop for HF_Synth to work on entire rupture at a time
+
*Determine which metrics are needed for SCEC CyberShake poster and work on them
*Check on pegasus-statistics
 
*Add foreign keys to PeakAmps table
 
  
 
== Blocked ==
 
== Blocked ==
*No
+
*Blue Waters node-hours?
  
 
== Follow-ups ==
 
== Follow-ups ==

Revision as of 18:10, 2 September 2015

Yesterday

  • Finished DAX generator for BB CyberShake
  • Created script to run DAX generator and interface with runs

Today

  • Start testing BB CyberShake workflows
  • Determine which metrics are needed for SCEC CyberShake poster and work on them

Blocked

  • Blue Waters node-hours?

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration