Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
8/20/15
+
8/21/15
  
 
== Yesterday: ==
 
== Yesterday: ==
* out sick, previously:
+
* skype with Ned/Morgan on UCERF3-ETAS and what analytics we need
* finished binary I/O for ETAS catalogs - now much faster
+
** modified ETAS code to work with long catalogs
* worked on adding pre-calculation target data to ETAS analytics
+
** ran a number of 30 year simulations for Morgan to analyze with her Matlab code
 +
* did first hazard calculations with site amplification implementation
  
 
== Today: ==
 
== Today: ==
* skype with Ned/Morgan on UCERF3-ETAS and what analytics we need
+
* more ETAS simulations for Ned/Morgan
** analytic followups
+
** analyze results from overnight - look at moment/event rate variability among catalogs
* implement site amplification test cases for Jon/Kioumars
+
** possibly grid search over parameters
 +
* modify site amplification framework to work with attenuation relationship applet (a little tricky), compare to test cases
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:20, 21 August 2015

8/21/15

Yesterday:

  • skype with Ned/Morgan on UCERF3-ETAS and what analytics we need
    • modified ETAS code to work with long catalogs
    • ran a number of 30 year simulations for Morgan to analyze with her Matlab code
  • did first hazard calculations with site amplification implementation

Today:

  • more ETAS simulations for Ned/Morgan
    • analyze results from overnight - look at moment/event rate variability among catalogs
    • possibly grid search over parameters
  • modify site amplification framework to work with attenuation relationship applet (a little tricky), compare to test cases

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)