Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
8/27/15
+
8/28/15
  
 
== Yesterday: ==
 
== Yesterday: ==
 
* ETAS work:
 
* ETAS work:
** worked on estimating mode of arbitrarily discretized empirical distribution
+
** added automatic metadata generation/parsing to ETAS code
** eventually realized that ETAS catalogs are evenly discretized
+
** improved distance decay plots
** added map based plot of nucleation rates
+
** plots for M7 poisson case to show why it's unrealistic
** added histograms of event generations
+
** fixed catalog duration issues in plot code
  
 
== Today: ==
 
== Today: ==
 
* ETAS work:
 
* ETAS work:
 +
** more plot updates for Ned
 
** map historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences
 
** map historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences
 
** modify ETAS simulation code to work with arbitrary start time (e.g. right after occurrence of historical EQ)
 
** modify ETAS simulation code to work with arbitrary start time (e.g. right after occurrence of historical EQ)
** more plot additions
 
 
* get Kioumars' simplified site amplification prototype working to use as test case against my implementation
 
* get Kioumars' simplified site amplification prototype working to use as test case against my implementation
  

Revision as of 16:55, 28 August 2015

8/28/15

Yesterday:

  • ETAS work:
    • added automatic metadata generation/parsing to ETAS code
    • improved distance decay plots
    • plots for M7 poisson case to show why it's unrealistic
    • fixed catalog duration issues in plot code

Today:

  • ETAS work:
    • more plot updates for Ned
    • map historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences
    • modify ETAS simulation code to work with arbitrary start time (e.g. right after occurrence of historical EQ)
  • get Kioumars' simplified site amplification prototype working to use as test case against my implementation

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)