Difference between revisions of "Staff Priorities - Kevin"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
− | 9/ | + | 9/9/15 |
== Yesterday: == | == Yesterday: == | ||
− | * | + | * complete first draft of poster including a few new figures |
− | |||
− | |||
== Today: == | == Today: == | ||
− | * | + | * met with Tom |
− | * | + | * revise poster based on feedback |
+ | ** 1 new figure, some revisions | ||
+ | * configure/submit new ETAS runs on Stampede for Ned | ||
+ | * begin parsing XLS file from CFM group | ||
+ | * work on slides for CISM meeting | ||
== Blocked: == | == Blocked: == |
Revision as of 16:58, 9 September 2015
9/9/15
Yesterday:
- complete first draft of poster including a few new figures
Today:
- met with Tom
- revise poster based on feedback
- 1 new figure, some revisions
- configure/submit new ETAS runs on Stampede for Ned
- begin parsing XLS file from CFM group
- work on slides for CISM meeting
Blocked:
no
Followups:
no
Lower priority or longer term tasks
- Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
- finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences