Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
1/5/16
+
1/6/16
  
 
== Yesterday: ==
 
== Yesterday: ==
* winter break
 
 
== Today: ==
 
 
* launch a handful of 10,000 year ETAS simulations for Ned (will also be useful for generating recurrence plots)
 
* launch a handful of 10,000 year ETAS simulations for Ned (will also be useful for generating recurrence plots)
 
* revamp ETAS analysis framework to be able to handle datasets that are larger than available memory
 
* revamp ETAS analysis framework to be able to handle datasets that are larger than available memory
 
** iteration over large binary data files, loading in one catalog at a time for processing
 
** iteration over large binary data files, loading in one catalog at a time for processing
* revisit site amplification framework in anticipation of meeting with Kioumars and Christine tomorrow
+
* tracked down bug in UCERF3-TD data file posted in electronic supplements
 +
* clean up scratch space on opensha, move larger datasets to scec-02
 +
 
 +
== Today: ==
 +
* meeting with Jon Stewart, Kioumars, and Christine on site amplification framework
 
* AGU reimbursement
 
* AGU reimbursement
* clean up scratch space on opensha, move larger datasets to scec-02
+
* identify any figures affected by bug in UCERF3-TD calculation, redo calculations
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 18:17, 6 January 2016

1/6/16

Yesterday:

  • launch a handful of 10,000 year ETAS simulations for Ned (will also be useful for generating recurrence plots)
  • revamp ETAS analysis framework to be able to handle datasets that are larger than available memory
    • iteration over large binary data files, loading in one catalog at a time for processing
  • tracked down bug in UCERF3-TD data file posted in electronic supplements
  • clean up scratch space on opensha, move larger datasets to scec-02

Today:

  • meeting with Jon Stewart, Kioumars, and Christine on site amplification framework
  • AGU reimbursement
  • identify any figures affected by bug in UCERF3-TD calculation, redo calculations

Blocked:

no

Followups:

Ned


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
  • finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences