Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Reply to software @ scec
+
* Mainly working on Part-B scripts
* Call with JB
+
** Originally provided by RK as Matlab code
** Magnitude/Area Scaling Study
+
** Removing Matlab dependency
** New M 7.0 SRC/STL files
+
** Adding lines from Christine directly
* Talked to DG regarding UCVM implementation
+
** Done for NGAW2, need NGAW1
** Replied to KO, RG regarding Vs/Vp's used for High-F
+
* Replied to JB questions
** Posted High-F results on Wiki -- good match between RWG/AWP/Hercules
+
* BBP call
* Finished Part-A simulations for SGS
+
** Discussion on multi-segment ruptures
* Started looking into GMPEs from SR
 
  
 
== Today ==
 
== Today ==
  
* Plots for SGS
+
* Continue working on NGAW2 Part-B plots
* Start simulations for JB on HPCC
+
** All Python
* GMPE implementation for SR code
+
* Look into GMSV plots
  
 
== Blocked: ==
 
== Blocked: ==
Line 23: Line 22:
 
== Followups: ==
 
== Followups: ==
  
* No
+
* High-F follow-up with PM, CG, DG @1:30pm
  
 
== To Do: ==
 
== To Do: ==

Revision as of 23:19, 25 January 2016

Yesterday

  • Mainly working on Part-B scripts
    • Originally provided by RK as Matlab code
    • Removing Matlab dependency
    • Adding lines from Christine directly
    • Done for NGAW2, need NGAW1
  • Replied to JB questions
  • BBP call
    • Discussion on multi-segment ruptures

Today

  • Continue working on NGAW2 Part-B plots
    • All Python
  • Look into GMSV plots

Blocked:

  • No

Followups:

  • High-F follow-up with PM, CG, DG @1:30pm

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon