Difference between revisions of "Staff Priorities - Kevin"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
− | 3/ | + | 3/30/16 |
== Yesterday: == | == Yesterday: == | ||
− | * | + | * operational aftershock forecasting (OAF) work: |
− | * | + | ** plot updates for forecast window: fractiles, mode, mean |
− | + | ** added computation of Bayesian combination model of generic and sequence specific models | |
− | ** added | + | * helped student with OpenSHA/Hazard Spectrum Application questions |
− | ** | + | * refactored simulator fault element objects in OpenSHA to allow for triangular elements, began triangle implementation |
== Today: == | == Today: == | ||
+ | * CISM call at 9am | ||
+ | * UCERF3-ETAS call at noon | ||
+ | * OAF application work: | ||
+ | ** make b-value calculation optional, default to generic parameters b-value for bayesian model | ||
+ | * RSQSim/OpenSHA work | ||
+ | ** continue triangle implementation: | ||
+ | ** triangular fault surface implementation and SCEC-VDO support | ||
+ | ** loading of triangular elements from barall file format | ||
* site amplification work | * site amplification work | ||
− | ** | + | ** waiting on documentation requests/feedback |
− | |||
− | |||
− | |||
− | |||
== Blocked: == | == Blocked: == |
Revision as of 17:10, 30 March 2016
3/30/16
Yesterday:
- operational aftershock forecasting (OAF) work:
- plot updates for forecast window: fractiles, mode, mean
- added computation of Bayesian combination model of generic and sequence specific models
- helped student with OpenSHA/Hazard Spectrum Application questions
- refactored simulator fault element objects in OpenSHA to allow for triangular elements, began triangle implementation
Today:
- CISM call at 9am
- UCERF3-ETAS call at noon
- OAF application work:
- make b-value calculation optional, default to generic parameters b-value for bayesian model
- RSQSim/OpenSHA work
- continue triangle implementation:
- triangular fault surface implementation and SCEC-VDO support
- loading of triangular elements from barall file format
- site amplification work
- waiting on documentation requests/feedback
Blocked:
no
Followups:
no
Lower priority or longer term tasks
- once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
- wiki page for web services