Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 10: Line 10:
 
*CyberShake writeup to Christine with figure/images; pull out caption
 
*CyberShake writeup to Christine with figure/images; pull out caption
 
*Waveforms for the 1 site x 3 realizations that are Northridge-like
 
*Waveforms for the 1 site x 3 realizations that are Northridge-like
 +
*Overlay CA trace on fwd sim movie
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:25, 27 April 2016

Yesterday

  • Regenerated missing ruptures
  • 1 more Study 15.12 site done: 3 to go
  • Populated Moment DB with missing tables
  • Rob's SRF looks different; not sure why

Today

  • Continue work on Study 15.12
  • Investigate SRF problem with Rob
  • CyberShake writeup to Christine with figure/images; pull out caption
  • Waveforms for the 1 site x 3 realizations that are Northridge-like
  • Overlay CA trace on fwd sim movie

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration