Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Regenerated missing ruptures
+
*Finished Study 15.12
*1 more Study 15.12 site done: 3 to go
+
*Worked on overlaying CA trace on movies
*Populated Moment DB with missing tables
+
*Sent seismogram data to C.B.
*Rob's SRF looks different; not sure why
 
  
 
== Today ==
 
== Today ==
*Continue work on Study 15.12
+
*Try installing BBP on Blue Waters
*Investigate SRF problem with Rob
+
*Continue working on overlaying CA trace
*CyberShake writeup to Christine with figure/images; pull out caption
 
*Waveforms for the 1 site x 3 realizations that are Northridge-like
 
*Overlay CA trace on fwd sim movie
 
*Change moment DB so all tables are MyISAM
 
 
*Upload Study 15.12 maps to wiki
 
*Upload Study 15.12 maps to wiki
 
*Send out Doodle for intern meeting
 
*Send out Doodle for intern meeting
 
*Plan meeting to discuss DB approach
 
*Plan meeting to discuss DB approach
 +
*Change moment DB so all tables are MyISAM
  
 
== Blocked ==
 
== Blocked ==
Line 20: Line 16:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*High-F
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:07, 2 May 2016

Yesterday

  • Finished Study 15.12
  • Worked on overlaying CA trace on movies
  • Sent seismogram data to C.B.

Today

  • Try installing BBP on Blue Waters
  • Continue working on overlaying CA trace
  • Upload Study 15.12 maps to wiki
  • Send out Doodle for intern meeting
  • Plan meeting to discuss DB approach
  • Change moment DB so all tables are MyISAM

Blocked

  • No

Follow-ups

  • High-F

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration