Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 4: Line 4:
 
* Updated HighF waveforms
 
* Updated HighF waveforms
 
* BBP RC install on broadband.usc.edu
 
* BBP RC install on broadband.usc.edu
* NEC Dinner
+
* LB Earthquake Conference Dinner
  
 
== Today: ==
 
== Today: ==

Revision as of 16:57, 2 May 2016

Yesterday:

  • off-site meeting Th/F
  • ALCF/OLCF Q1 reports and review
  • Updated HighF waveforms
  • BBP RC install on broadband.usc.edu
  • LB Earthquake Conference Dinner

Today:

  • High-F 11am
  • BBP RC install Mac

Blocked:

  • No

Followups:

  • No

Pending:

  • test JS bbp/ucvm
  • cross_sections of models to rg
  • PBR site review
  • UCVM Mods for meshes
  • ABF into CME codebase
  • CFM DB Schema Review
  • CME home page reference check
  • Check on mis-labeled time series from NK
  • Toms' presidential address as SSA
  • Request submitted pubs list from JM
  • Research ps tech
  • Create trac ticket for BBP 32 bit
  • NHM access for Staff

Related Entries