Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 11: Line 11:
 
*Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
 
*Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
 
*Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
 
*Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
 +
*Get codes together for David and Billy
 
*Check on PAS run
 
*Check on PAS run
  

Revision as of 22:56, 20 May 2016

Yesterday

  • Continue work on statewide 1 Hz SGT run - parallelized smoothing code
  • Workflow presentation call
  • Call with Phil on tomography
  • Queued up PAS with rvsig1=0.1 to compare

Today

  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Figure out what to do about intern XSEDE accounts
  • Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
  • Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
  • Get codes together for David and Billy
  • Check on PAS run

Blocked

  • No

Follow-ups

  • Tomography call at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration