Difference between revisions of "Talk:CSEP Working Group"
From SCECpedia
Jump to navigationJump to search (Created page with "==5 Year Plan==") |
|||
| Line 1: | Line 1: | ||
| − | ==5 Year Plan== | + | ==CSEP2 -- 5 Year Plan== |
| + | (Items listed in no particular order) | ||
| + | * Develop relationships with users | ||
| + | * Outreach | ||
| + | * Curated CSEP1 data set | ||
| + | * Evaluating simulation-based forecasts | ||
| + | * Ensemble models | ||
| + | * Fault-based forcasts | ||
| + | * Removing Poisson Assumption | ||
| + | * Improve code-base to be more flexible | ||
| + | * Including ground motions | ||
| + | ** GMPE | ||
| + | ** Simulation Based (i.e. BBP) | ||
Revision as of 22:13, 14 February 2018
CSEP2 -- 5 Year Plan
(Items listed in no particular order)
- Develop relationships with users
- Outreach
- Curated CSEP1 data set
- Evaluating simulation-based forecasts
- Ensemble models
- Fault-based forcasts
- Removing Poisson Assumption
- Improve code-base to be more flexible
- Including ground motions
- GMPE
- Simulation Based (i.e. BBP)