Difference between revisions of "Product Backlog - Fabio"

From SCECpedia
Jump to navigationJump to search
m (Maechlin moved page Product/Project Backlog - Fabio to Product Backlog - Fabio: standardize names of backlogs pages)
Line 2: Line 2:
  
 
== Project/Product Backlog ==
 
== Project/Product Backlog ==
* Work with AP to integrate I. recipe V2 into BBP processing
+
* Reimplement Seismtools
 +
** Meet with CG, define processing steps
 +
** Copy seismtools repository and implement updated steps for time series processing functions
 +
* Integrate Irikura Recipe Method 2 into BBP
 +
** Compare URS codes vs AI updated codes, resolve differences
 +
** Add statgreen2 to the processing pipeline for vertical component
 +
** Run validation pacakges, share results with HM, AI, AP, CG
 
* Update song method with multi-segment rupture generator
 
* Update song method with multi-segment rupture generator
 
* Work with RG regarding updated GFs for central California.
 
* Work with RG regarding updated GFs for central California.
 +
* Create validation packages for new events: Parafield, San Simeon
 
* Complete UCSB multi-fault rupture generator integration, debug differences
 
* Complete UCSB multi-fault rupture generator integration, debug differences
* CSEP Operations training with WS/PM
+
* Support CSEP Operations and Reprocessing efforts, helping WS
* Rewrite Seismtools package to use CG's time series processing functions
 
  
 
== Related Entries ==
 
== Related Entries ==
 
*[[CME Software Staff]]
 
*[[CME Software Staff]]
 
*[[CME Project]]
 
*[[CME Project]]

Revision as of 18:03, 15 March 2018

Fabio Silva's Project/Product Backlog

Project/Product Backlog

  • Reimplement Seismtools
    • Meet with CG, define processing steps
    • Copy seismtools repository and implement updated steps for time series processing functions
  • Integrate Irikura Recipe Method 2 into BBP
    • Compare URS codes vs AI updated codes, resolve differences
    • Add statgreen2 to the processing pipeline for vertical component
    • Run validation pacakges, share results with HM, AI, AP, CG
  • Update song method with multi-segment rupture generator
  • Work with RG regarding updated GFs for central California.
  • Create validation packages for new events: Parafield, San Simeon
  • Complete UCSB multi-fault rupture generator integration, debug differences
  • Support CSEP Operations and Reprocessing efforts, helping WS

Related Entries