Difference between revisions of "Product Backlog - Fabio"

From SCECpedia
Jump to navigationJump to search
 
Line 1: Line 1:
 
Fabio Silva's Project/Product Backlog
 
Fabio Silva's Project/Product Backlog
 +
 +
== In Progress Tasks ==
 +
* Reimplement Seismtools
 +
** Met with CG, defined processing steps
 +
** Started ts_process repository
 +
** Implementing processing steps as requested by CG
 +
* Create validation packages for new events: Parkfield, San Simeon
 +
** Created Central California BBP Region
 +
** Created Parkfield package
 +
** Running simulations on BBP and HPCC
 +
* Migrate BBP cluster tools from pbs to slurm
  
 
== Project/Product Backlog ==
 
== Project/Product Backlog ==
* Reimplement Seismtools
 
** Meet with CG, define processing steps
 
** Copy seismtools repository and implement updated steps for time series processing functions
 
 
* Integrate Irikura Recipe Method 2 into BBP
 
* Integrate Irikura Recipe Method 2 into BBP
 
** Compare URS codes vs AI updated codes, resolve differences
 
** Compare URS codes vs AI updated codes, resolve differences
Line 10: Line 18:
 
** Run validation pacakges, share results with HM, AI, AP, CG
 
** Run validation pacakges, share results with HM, AI, AP, CG
 
* Update song method with multi-segment rupture generator
 
* Update song method with multi-segment rupture generator
* Work with RG regarding updated GFs for central California.
+
* Integrate newer 5.4.1 version of GP rupture generator into BBP
* Create validation packages for new events: Parafield, San Simeon
 
 
* Complete UCSB multi-fault rupture generator integration, debug differences
 
* Complete UCSB multi-fault rupture generator integration, debug differences
 
* Support CSEP Operations and Reprocessing efforts, helping WS
 
* Support CSEP Operations and Reprocessing efforts, helping WS

Latest revision as of 16:53, 25 April 2018

Fabio Silva's Project/Product Backlog

In Progress Tasks

  • Reimplement Seismtools
    • Met with CG, defined processing steps
    • Started ts_process repository
    • Implementing processing steps as requested by CG
  • Create validation packages for new events: Parkfield, San Simeon
    • Created Central California BBP Region
    • Created Parkfield package
    • Running simulations on BBP and HPCC
  • Migrate BBP cluster tools from pbs to slurm

Project/Product Backlog

  • Integrate Irikura Recipe Method 2 into BBP
    • Compare URS codes vs AI updated codes, resolve differences
    • Add statgreen2 to the processing pipeline for vertical component
    • Run validation pacakges, share results with HM, AI, AP, CG
  • Update song method with multi-segment rupture generator
  • Integrate newer 5.4.1 version of GP rupture generator into BBP
  • Complete UCSB multi-fault rupture generator integration, debug differences
  • Support CSEP Operations and Reprocessing efforts, helping WS

Related Entries