Difference between revisions of "Broadband Hanging Wall Simulation"
From SCECpedia
Jump to navigationJump to searchLine 13: | Line 13: | ||
36 Code base combinations | 36 Code base combinations | ||
− | + | Stations in Station List by rupture | |
− | + | ------------------- | |
− | + | Mw6.0: 105 | |
− | + | Mw6.5: 117 | |
+ | Mw7.0: 163 | ||
+ | Mw7.5: 175 | ||
------------------ | ------------------ |
Revision as of 17:45, 5 October 2011
This Wiki page describes the simulations that will be performed on the Broadband Platform to investigate footwall / hanging wall and directivity effects for NGA-W2. This simulation is expected to generate 205,776 3-component seismograms.
Hanging Wall Specifications
Robert Graves has written a specification for a set of footwall and hanging wall simulation in this document.
Computational Estimates
40 Scenarios per code base 36 Code base combinations Stations in Station List by rupture ------------------- Mw6.0: 105 Mw6.5: 117 Mw7.0: 163 Mw7.5: 175 ------------------ Seismograms per run (stations * variations): Mw6.0: 105 * 9 Mw6.5: 117 * 9 Mw7.0: 163 * 11 Mw7.5: 175 * 11 ------------------ Total: 5716 seismograms per run Total simulation: 40*18*2 = 1440 Total Seismograms = 36*5716 = 205,776 Runtime: (6.0 40 mins, 6.5 2 hrs, 7.0 8 hrs, 7.5 34 hrs) Mw6.0: (9*36) runs *40 mins = 216 hrs Mw6.5: (9*36) runs *2 hrs = 648 hrs Mw7.0: (11*36) runs *8 hrs = 3168 hrs Mw7.5: (11*36) runs *34 hrs = 13464 hrs ------------------------------------------- Total runtime (1 core): 729 Days