Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* 11.2.3 validation tests are complete now
+
* Setup new laptop
* Final touches on the validation test script
+
* Ran tests for URS(3d)/SDSU/SDSU with and without site response
* Compared 11.2.3 and trunk (using Loma Prieta/URS)
+
* Talked to Phil regarding Broadband development, priorities
** Compared several files (output looks identical)
+
* Python code reworking
** Missing ps files (changed validation script to deal with that)
 
** Missing xml file in outdata directory (changed run_bbp_2g to copy it)
 
* Fixed Trak#73 (wrong units in acc bbp file header)
 
  
 
== Today: ==
 
== Today: ==
* Go through Trak issues with Phil and prioritize development
+
* Continue investigating differences in SDSU validation tests
* Setup new laptop
+
* Study Broadband distribution layout, content in GF directories
* Start running first Fling Study scenario (101) on HPCC
+
* Get ready to run Fling Study scenarios on HPCC when Phil's run ends
  
 
== Blocked: ==
 
== Blocked: ==
Line 17: Line 14:
  
 
== Followups: ==
 
== Followups: ==
* Meeting with Phil after standup call to discuss priorities
+
* No

Revision as of 17:06, 22 May 2012

Yesterday:

  • Setup new laptop
  • Ran tests for URS(3d)/SDSU/SDSU with and without site response
  • Talked to Phil regarding Broadband development, priorities
  • Python code reworking

Today:

  • Continue investigating differences in SDSU validation tests
  • Study Broadband distribution layout, content in GF directories
  • Get ready to run Fling Study scenarios on HPCC when Phil's run ends

Blocked:

  • No

Followups:

  • No