Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Call with Ronnie and Katie about Fling Study |
− | ** | + | ** Ronnie will make changes to station lists, then we are good to go |
− | * | + | * Reproduced Rumi's results using 11.2.3 and her scenarios |
− | + | ** Results do not look good when using URS codebase for LF | |
− | + | * Initial analysis of space and time requirements for running Fling Study | |
− | ** | + | ** Short summary: 1.7Tb and about 3 months :-(! |
− | * | ||
− | ** | ||
− | |||
== Today: == | == Today: == | ||
− | * | + | |
− | * | + | * Organize Fling Study information on the wiki, create progress tables |
+ | ** Trac #95 (wiki updating) | ||
+ | * Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run | ||
+ | * Meet with Phil and John Yu wrt Fling Study strategy | ||
* Make trunk work both with and without site response | * Make trunk work both with and without site response | ||
− | |||
− | |||
== Ongoing: == | == Ongoing: == | ||
Line 27: | Line 25: | ||
== Followups: == | == Followups: == | ||
− | + | * Meeting with John Yu and Phil @ TBD | |
− | * Meeting with John Yu @ TBD |
Revision as of 17:04, 25 May 2012
Contents
Yesterday:
- Call with Ronnie and Katie about Fling Study
- Ronnie will make changes to station lists, then we are good to go
- Reproduced Rumi's results using 11.2.3 and her scenarios
- Results do not look good when using URS codebase for LF
- Initial analysis of space and time requirements for running Fling Study
- Short summary: 1.7Tb and about 3 months :-(!
Today:
- Organize Fling Study information on the wiki, create progress tables
- Trac #95 (wiki updating)
- Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
- Meet with Phil and John Yu wrt Fling Study strategy
- Make trunk work both with and without site response
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other
Blocked:
- No
Followups:
- Meeting with John Yu and Phil @ TBD