Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search (→Today:) |
|||
Line 5: | Line 5: | ||
** Ran Scenario 107, compared results against John's run --> OK | ** Ran Scenario 107, compared results against John's run --> OK | ||
** Started Scenario 113 | ** Started Scenario 113 | ||
− | ** Updated wiki tables | + | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS |
* Investigated SDSU's validation run | * Investigated SDSU's validation run | ||
** BBToolbox and Amp.exe use 2 different set of velocities | ** BBToolbox and Amp.exe use 2 different set of velocities |
Revision as of 17:10, 1 June 2012
Contents
Yesterday:
- Fling Study
- Finished running Scenario 104
- Ran Scenario 107, compared results against John's run --> OK
- Started Scenario 113
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Investigated SDSU's validation run
- BBToolbox and Amp.exe use 2 different set of velocities
- Not able to reproduce Rumi's graph, need to follow up with her
Today:
- Fling Study
- Continue to schedule Fling scenarios
- Scenario 113 should finish soon, start 114 and 115.
- Verify John's scenario 108
- Follow-up with Rumi wrt her validation run results
- Find a place in the BB src tree to put the plot files
Blocked:
- No
Followups:
- SDSU's result validation with Rumi
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other