Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
− | ** | + | ** Monitoring Scenario 116 on HPCC |
− | ** John Yu ran | + | ** John Yu ran Scenario 121. Running many others right now. |
** GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8) | ** GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8) | ||
** HPCC running small/medium scenarios (max wall time is 2 weeks according to John) | ** HPCC running small/medium scenarios (max wall time is 2 weeks according to John) | ||
Line 14: | Line 14: | ||
* Fling Study | * Fling Study | ||
− | ** Continue to schedule Fling scenarios | + | ** Continue to schedule Fling scenarios after 116 ends |
** Move data and validate all completed scenarios | ** Move data and validate all completed scenarios | ||
* Follow-up with Rumi wrt her validation run results | * Follow-up with Rumi wrt her validation run results | ||
− | |||
* Find a place in the BB src tree to put the plot files | * Find a place in the BB src tree to put the plot files | ||
Line 24: | Line 23: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Follow-up with Rumi to compare results from BBP and SDSU |
== Ongoing: == | == Ongoing: == |
Revision as of 17:12, 5 June 2012
Contents
Yesterday:
- Fling Study
- Monitoring Scenario 116 on HPCC
- John Yu ran Scenario 121. Running many others right now.
- GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
- HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Investigated SDSU's validation run
- Not able to reproduce Rumi's graph, need to follow up with her
- Found out that BBToolbox generates different graphs depending on how many stations we have
Today:
- Fling Study
- Continue to schedule Fling scenarios after 116 ends
- Move data and validate all completed scenarios
- Follow-up with Rumi wrt her validation run results
- Find a place in the BB src tree to put the plot files
Blocked:
- No
Followups:
- Follow-up with Rumi to compare results from BBP and SDSU
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other