Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
* Fling Study
 
* Fling Study
** Monitoring Scenario 116 on HPCC
+
** Finished running Scenarios 116, 132, 133, 134 on HPCC
** John Yu ran Scenario 121. Running many others right now.
+
** Started Scenario 136 (longer)
** GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
+
** John Yu ran Scenarios 105 and 115. Running others right now.
** HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
 
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
 
* Investigated SDSU's validation run
 
* Investigated SDSU's validation run
** Not able to reproduce Rumi's graph, need to follow up with her
+
** Able to reproduce hyb files from Rumi, sent her e-mail with details
** Found out that BBToolbox generates different graphs depending on how many stations we have
 
  
 
== Today: ==
 
== Today: ==
  
 
* Fling Study
 
* Fling Study
** Continue to schedule Fling scenarios after 116 ends
+
** Validate all the data from yesterday
** Move data and validate all completed scenarios
+
* Wait for Rumi to reply to my questions
* Follow-up with Rumi wrt her validation run results
+
* Back to Python
* Find a place in the BB src tree to put the plot files
+
** Find a place in the BBP src tree to put the plot files
 +
** Look for ways to update station list format to include additional parameters
  
 
== Blocked: ==
 
== Blocked: ==
Line 23: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* Follow-up with Rumi to compare results from BBP and SDSU
+
* Cybershake call at 11am
  
 
== Ongoing: ==  
 
== Ongoing: ==  

Revision as of 17:10, 6 June 2012

Yesterday:

Today:

  • Fling Study
    • Validate all the data from yesterday
  • Wait for Rumi to reply to my questions
  • Back to Python
    • Find a place in the BBP src tree to put the plot files
    • Look for ways to update station list format to include additional parameters

Blocked:

  • No

Followups:

  • Cybershake call at 11am

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other