Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
− | ** Finished running | + | ** Finished running Scenario 136 on HPCC |
− | ** Started Scenario | + | ** Started Scenario 138 (longer) |
− | ** John Yu ran Scenarios | + | ** John Yu ran Scenarios 125 and 126 (had to run 125 twice due to quirk) |
+ | ** To reduce problems in scec-01, new data is getting put on /home/broadband-00 | ||
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
− | * | + | * Removed (most) GATech code from BBP |
− | |||
== Today: == | == Today: == | ||
Line 13: | Line 13: | ||
* Fling Study | * Fling Study | ||
** Validate all the data from yesterday | ** Validate all the data from yesterday | ||
− | * | + | * Look at Rumi's updated runs |
* Back to Python | * Back to Python | ||
− | ** | + | ** Finish removing GATech scripts |
− | ** | + | ** Sketch updated directory structure for plots/other scripts |
== Blocked: == | == Blocked: == | ||
Line 22: | Line 22: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
== Ongoing: == | == Ongoing: == |
Revision as of 16:00, 7 June 2012
Contents
Yesterday:
- Fling Study
- Finished running Scenario 136 on HPCC
- Started Scenario 138 (longer)
- John Yu ran Scenarios 125 and 126 (had to run 125 twice due to quirk)
- To reduce problems in scec-01, new data is getting put on /home/broadband-00
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Removed (most) GATech code from BBP
Today:
- Fling Study
- Validate all the data from yesterday
- Look at Rumi's updated runs
- Back to Python
- Finish removing GATech scripts
- Sketch updated directory structure for plots/other scripts
Blocked:
- No
Followups:
- No
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other