Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
− | ** We are now | + | ** We are now 36/42 |
− | ** Scenario 117 finished, | + | ** Scenario 117 (7.8M) finished and was verified, tar file created |
− | ** | + | ** Scenario 137 (7.5M) finished, needs to be verified |
+ | ** After filesystem was restored, started Scenario 139, John Yu restarted the remaining cases on GEOSYS | ||
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
− | * | + | * Meetings with Phil to discuss broadband development, defined milestones for this week |
− | * | + | * Talked to Kevin, and got his Cruise Control configuration file |
− | |||
− | |||
== Today: == | == Today: == | ||
* Fling Study | * Fling Study | ||
− | ** Validate scenario | + | ** Validate scenario 137, create tar file |
− | * | + | * Meet with John Yu to discuss Broadband services/data and Cruise Control setup |
− | + | * Create Cruise Control configuration file, resolve any dependencies | |
− | |||
− | |||
− | * | ||
== Blocked: == | == Blocked: == | ||
− | * | + | * No |
== Followups: == | == Followups: == | ||
− | * | + | * John Yu: Cruise Control setup, backup status @ TBD |
== Ongoing: == | == Ongoing: == | ||
* Look for ways to break up the GF directory layout, some ideas are: | * Look for ways to break up the GF directory layout, some ideas are: | ||
+ | ** Figure out how to separate the validation data from Greens Functions | ||
** Create separate validation package | ** Create separate validation package | ||
** Separate events and codebases from each other | ** Separate events and codebases from each other |
Revision as of 17:12, 18 June 2012
Contents
Yesterday:
- Fling Study
- We are now 36/42
- Scenario 117 (7.8M) finished and was verified, tar file created
- Scenario 137 (7.5M) finished, needs to be verified
- After filesystem was restored, started Scenario 139, John Yu restarted the remaining cases on GEOSYS
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Meetings with Phil to discuss broadband development, defined milestones for this week
- Talked to Kevin, and got his Cruise Control configuration file
Today:
- Fling Study
- Validate scenario 137, create tar file
- Meet with John Yu to discuss Broadband services/data and Cruise Control setup
- Create Cruise Control configuration file, resolve any dependencies
Blocked:
- No
Followups:
- John Yu: Cruise Control setup, backup status @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other