Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
* Fling Study
 
* Fling Study
 
** We are now 40/42
 
** We are now 40/42
** Remaining scenarios all running on GEOSYS
+
** GEOSYS had a power outage yesterday -- running scenarios terminated
 +
** Running 118 and 124 on HPCC, using trunk and updated parallel scripts
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
 
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
* Running full validation test for URS
+
* Finished running URS full validation test
** Comparing trunk and 11.2.3 on broadband.usc.edu
+
** trunk and 11.2.3 results match on broadband.usc.edu
** LP and LA passed, waiting for NR to finish running
 
* Trac #122: Allowing users to specify alternative data root directory using env variable: Done.
 
 
* Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
 
* Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
** Problems running on /scratch
+
** Scenario 104 ran in 36 hours, (versus 60 hours previously).
** Changed to /tmp and was able to run Fling scenario 101 in 46 min (versus 1h34m using regular scripts)
+
** Still some room for improvement, by staging in data (maybe worth for longer scenarios)
** Compared new Fling scenario 101 with previous HPCC run (from 11.2.3) and it matches 100%
+
* John Yu installed Cruise Control
** Running Fling Scenario 104 using new script (previous runtime was 2.5 days)
 
  
 
== Today: ==
 
== Today: ==
Line 21: Line 19:
 
* Package new running scripts and check them into svn as part of BBP
 
* Package new running scripts and check them into svn as part of BBP
 
* Continue working on the testing framework
 
* Continue working on the testing framework
* Work on Cruise Control setup (pending John Yu install)
+
* Plan separation of GF, validation data, and velocity models
 +
* Work on Cruise Control setup
  
 
== Blocked: ==
 
== Blocked: ==
* John Yu: Installing Cruise Control
+
* No
  
 
== Followups: ==
 
== Followups: ==

Revision as of 17:48, 28 June 2012

Yesterday:

  • Fling Study
  • Finished running URS full validation test
    • trunk and 11.2.3 results match on broadband.usc.edu
  • Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
    • Scenario 104 ran in 36 hours, (versus 60 hours previously).
    • Still some room for improvement, by staging in data (maybe worth for longer scenarios)
  • John Yu installed Cruise Control

Today:

  • Fling Study
    • Monitoring running scenarios
  • Package new running scripts and check them into svn as part of BBP
  • Continue working on the testing framework
  • Plan separation of GF, validation data, and velocity models
  • Work on Cruise Control setup

Blocked:

  • No

Followups:

  • Meeting with Phil to talk about Broadband development priorities @ TBD

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other