Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
− | ** We are now | + | ** We are now 41/42 |
− | ** Running 118 | + | ** Scenario 124 finished on Saturday, needs to be verified |
− | ** | + | ** Running scenario 118 on HPCC, using trunk and updated parallel scripts |
+ | ** Scenario 118 is 210/241 stations, should finish on Wednesday | ||
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
− | * Trac issue #104: Environment variables select GF and validation: | + | * Fixed Trac issue #77 (UCSB LP validation) |
+ | * Met with Phil, discussed design ideas and priorities for Broadband development | ||
+ | * Broadband science call | ||
+ | * Trac issue #104: Environment variables select GF and validation directories: done, testing | ||
* Trac issue #82: Separate validation code from Greens Functions: done, testing | * Trac issue #82: Separate validation code from Greens Functions: done, testing | ||
Line 12: | Line 16: | ||
* Fling Study | * Fling Study | ||
− | ** Monitoring running | + | ** Verify scenario 124, generate tar file, and post data |
+ | ** Monitoring last running scenario | ||
+ | * Fix issue in GP code where filenames are cut short in site response module | ||
* Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Trac #104: Write sample scripts | * Trac #104: Write sample scripts | ||
− | * Trac #82: Run more acceptance tests | + | * Trac #82: Run more acceptance tests |
− | * | + | * Trac #84: User selectable Greens Functions |
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
* Trac issue #128: Start work on Cruise Control setup | * Trac issue #128: Start work on Cruise Control setup |
Revision as of 17:13, 9 July 2012
Contents
Yesterday:
- Fling Study
- We are now 41/42
- Scenario 124 finished on Saturday, needs to be verified
- Running scenario 118 on HPCC, using trunk and updated parallel scripts
- Scenario 118 is 210/241 stations, should finish on Wednesday
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Fixed Trac issue #77 (UCSB LP validation)
- Met with Phil, discussed design ideas and priorities for Broadband development
- Broadband science call
- Trac issue #104: Environment variables select GF and validation directories: done, testing
- Trac issue #82: Separate validation code from Greens Functions: done, testing
Today:
- Fling Study
- Verify scenario 124, generate tar file, and post data
- Monitoring last running scenario
- Fix issue in GP code where filenames are cut short in site response module
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Run more acceptance tests
- Trac #84: User selectable Greens Functions
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Start work on Cruise Control setup
Blocked:
- No
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events from each other