Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* NEES Meeting Boston
+
* EEW Call with Maren
* XSEDE Meeting Chicago
+
* BBP Call
 
+
* US/China GPU edits
 +
* Trip wrapup with SCEC
 +
*
 
== Today: ==
 
== Today: ==
 
* EEW summary for Maren
 
* EEW summary for Maren
* Trip wrapup with SCEC
 
 
* BBP Call
 
* BBP Call
 
* Schedule BBP Module Call with GA
 
* Schedule BBP Module Call with GA
* Schedule HR Meetings on Wed 25th
+
* Walter on HR Meetings on Wed 25th
* Schedule CS call with SC
+
* CS call 11am
 +
* Rudi DIBS proposal
 +
* Ralph source description
 +
* Kim on Rupture approach
 +
* Christine on SCEC visit
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 15:36, 23 July 2012

Yesterday:

  • EEW Call with Maren
  • BBP Call
  • US/China GPU edits
  • Trip wrapup with SCEC

Today:

  • EEW summary for Maren
  • BBP Call
  • Schedule BBP Module Call with GA
  • Walter on HR Meetings on Wed 25th
  • CS call 11am
  • Rudi DIBS proposal
  • Ralph source description
  • Kim on Rupture approach
  • Christine on SCEC visit

Blocked:

  • No

Followups:

  • No

Pending:

  • No