Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* RP II interview with DG
+
* Got unit and acceptance tests to work again on trunk
* e-mailed CG, and clarified issue of using LF/HF filters for generating GOF
+
* Regenerated validation packages for all events
* Call with KA, PM, and PS to discuss ExSim module
+
* Checked in latest code
* Uploaded SDSU MOGOF plots to the Broadband validation wiki
+
* Started work on rotd50 integration for both observed and calculated seismograms
* Re-worked GP GOF and SDSU GOF unit tests (pass now)
+
* BBP science call
* Re-generated inputs for acceptance tests (needed to include obs_seismograms module in the xml)
 
  
 
== Today: ==
 
== Today: ==
  
 +
* Send e-mail to CG to discuss rotD50 details
 +
* Finish rotD50 module integration
 +
* Work on site correction module
 
* Look into arias plots module
 
* Look into arias plots module
* Finish getting acceptance tests to pass
 
 
* Integrate new BBToolbox code into platform
 
* Integrate new BBToolbox code into platform
 
* Write script to run LOMAP full validation on HPCC
 
* Write script to run LOMAP full validation on HPCC

Revision as of 17:23, 20 August 2012

Yesterday:

  • Got unit and acceptance tests to work again on trunk
  • Regenerated validation packages for all events
  • Checked in latest code
  • Started work on rotd50 integration for both observed and calculated seismograms
  • BBP science call

Today:

  • Send e-mail to CG to discuss rotD50 details
  • Finish rotD50 module integration
  • Work on site correction module
  • Look into arias plots module
  • Integrate new BBToolbox code into platform
  • Write script to run LOMAP full validation on HPCC
  • Test batching scripts with trunk
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
    • Test new package with trunk

Blocked:

  • No

Followups:

  • No