Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Sent e-mail to RG about new GFs using DT 0.01
+
* Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
* Added bias plot for the psa5 output of RotD50
+
* Talked to JY, and got matplotlib updated on HPCC
** Similar to bias plot from respect data
+
* GOF unit test passes on HPCC
* Tested 12_8_3 event file from CG
 
** Longer station names - still runs file with GP codebase
 
 
* Set up trunk on HPCC
 
* Set up trunk on HPCC
** GOF unit test fails
+
* Updated batching scripts for using the new trunk
 +
** Ran Fling scenario 101
  
 
== Today: ==
 
== Today: ==
  
* Confirm with RA codebase-specific parameters DLEN, DWID
+
* Work on generating Arias duration plot
* Resolve trunk issues on HPCC
+
* Check batching scripts into svn (Trac #131)
** Update batching scripts for use with trunk
 
** Check them into svn (Trac #131)
 
 
* Write script to run LOMAP full validation on HPCC
 
* Write script to run LOMAP full validation on HPCC
  
Line 21: Line 18:
  
 
== Followups: ==
 
== Followups: ==
* Broadband mtg with Phil @ TBD
+
* No

Revision as of 17:37, 29 August 2012

Yesterday:

  • Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
  • Talked to JY, and got matplotlib updated on HPCC
  • GOF unit test passes on HPCC
  • Set up trunk on HPCC
  • Updated batching scripts for using the new trunk
    • Ran Fling scenario 101

Today:

  • Work on generating Arias duration plot
  • Check batching scripts into svn (Trac #131)
  • Write script to run LOMAP full validation on HPCC

Blocked:

  • No

Followups:

  • No