Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * Sent e-mail to | + | * Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters |
− | + | * Talked to JY, and got matplotlib updated on HPCC | |
− | * | + | * GOF unit test passes on HPCC |
− | * | ||
− | |||
* Set up trunk on HPCC | * Set up trunk on HPCC | ||
− | ** | + | * Updated batching scripts for using the new trunk |
+ | ** Ran Fling scenario 101 | ||
== Today: == | == Today: == | ||
− | * | + | * Work on generating Arias duration plot |
− | + | * Check batching scripts into svn (Trac #131) | |
− | * | ||
− | |||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
Line 21: | Line 18: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
Revision as of 17:37, 29 August 2012
Contents
Yesterday:
- Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
- Talked to JY, and got matplotlib updated on HPCC
- GOF unit test passes on HPCC
- Set up trunk on HPCC
- Updated batching scripts for using the new trunk
- Ran Fling scenario 101
Today:
- Work on generating Arias duration plot
- Check batching scripts into svn (Trac #131)
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- No