Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
+
* Worked on implementing the correct_rotd50 module
* Talked to JY, and got matplotlib updated on HPCC
+
* Compared fling results from new trunk to what we got in June --> Checks out fine.
* GOF unit test passes on HPCC
 
* Set up trunk on HPCC
 
 
* Updated batching scripts for using the new trunk
 
* Updated batching scripts for using the new trunk
** Ran Fling scenario 101
 
  
 
== Today: ==
 
== Today: ==
  
 +
* Finish correct_rotd50 module, write test case
 
* Work on generating Arias duration plot
 
* Work on generating Arias duration plot
 
* Check batching scripts into svn (Trac #131)
 
* Check batching scripts into svn (Trac #131)
 +
* Follow-up with RG, RA, JC regarding needed parameters for LOMAP
 
* Write script to run LOMAP full validation on HPCC
 
* Write script to run LOMAP full validation on HPCC
  
Line 18: Line 17:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* Broadband meeting with Phil @ TBD
 +
* Broadband science call @ 2pm

Revision as of 17:17, 31 August 2012

Yesterday:

  • Worked on implementing the correct_rotd50 module
  • Compared fling results from new trunk to what we got in June --> Checks out fine.
  • Updated batching scripts for using the new trunk

Today:

  • Finish correct_rotd50 module, write test case
  • Work on generating Arias duration plot
  • Check batching scripts into svn (Trac #131)
  • Follow-up with RG, RA, JC regarding needed parameters for LOMAP
  • Write script to run LOMAP full validation on HPCC

Blocked:

  • No

Followups:

  • Broadband meeting with Phil @ TBD
  • Broadband science call @ 2pm