Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Worked on implementing the correct_rotd50 module
+
* Finished correct_rotd50 module, tested ok
* Compared HPCC fling results from new trunk to what we got in June --> Checks out fine.
+
* Changed workflow generator so that it works with and without the site correction
* Updated batching scripts for using the new trunk
+
* Ran full validations for LP,LA,NR using UCSB code
 +
** Fixed minor issues
 +
* Checked batch utils into SVN
 +
* Broadband science call
 +
* Broadband meeting with Phil
  
 
== Today: ==
 
== Today: ==
  
* Finish correct_rotd50 module, write test case
+
* Create updated validation packages for all events
 +
** Add UCSB LOMAP files for test run
 +
* Start SCEC meeting poster
 +
* Look into new BBToolBox
 
* Work on generating Arias duration plot
 
* Work on generating Arias duration plot
* Check batching scripts into svn (Trac #131)
 
* Follow-up with RG, RA, JC regarding needed parameters for LOMAP
 
 
* Write script to run LOMAP full validation on HPCC
 
* Write script to run LOMAP full validation on HPCC
  
Line 17: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* Broadband meeting with Phil @ TBD
+
* No
* Broadband science call @ 2pm
 

Revision as of 17:07, 4 September 2012

Yesterday:

  • Finished correct_rotd50 module, tested ok
  • Changed workflow generator so that it works with and without the site correction
  • Ran full validations for LP,LA,NR using UCSB code
    • Fixed minor issues
  • Checked batch utils into SVN
  • Broadband science call
  • Broadband meeting with Phil

Today:

  • Create updated validation packages for all events
    • Add UCSB LOMAP files for test run
  • Start SCEC meeting poster
  • Look into new BBToolBox
  • Work on generating Arias duration plot
  • Write script to run LOMAP full validation on HPCC

Blocked:

  • No

Followups:

  • No