Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Separated GP GOF module into 2 parts
+
* Tested the new gen_plots and gp_gof modules
** gen_plots --> generates PSa and RotD50 comparisons, seismogram overlays
+
* Added arias duration plot to the gen_plots module
** gp_gof --> generates bias plots for both PSa and RotD50 data
+
* Exchanged e-mails with RG about changing the simulation run time
* e-mailed RG about changing the simulation run time
 
 
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
 
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
* Broadband development discussion with Phil
 
  
 
== Today: ==
 
== Today: ==
  
* Finish implementation of Arias Duration
+
* Test Arias Duration implementation, check code into svn
* Test gen_plots and new gp_gof, check code into svn
+
* Try running jbsim with different simulation windows
* Respond to RG's e-mail
+
* Call with RK, PM
* Start BBToolbox integration
+
* Work on BBToolbox integration
  
 
== Blocked: ==
 
== Blocked: ==
Line 19: Line 17:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* Cybershake call @ 11am
 +
* RK, PM call @ 1:30pm

Revision as of 16:51, 19 September 2012

Yesterday:

  • Tested the new gen_plots and gp_gof modules
  • Added arias duration plot to the gen_plots module
  • Exchanged e-mails with RG about changing the simulation run time
  • e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios

Today:

  • Test Arias Duration implementation, check code into svn
  • Try running jbsim with different simulation windows
  • Call with RK, PM
  • Work on BBToolbox integration

Blocked:

  • No

Followups:

  • Cybershake call @ 11am
  • RK, PM call @ 1:30pm