− | * | + | *AWP SGT jobs at USC finished |
− | * | + | *Ran verification test with RWG v3.0.3, seeing ~10% differences |
+ | *Emailed Rob with test results and analysis of differences, Rob says expected | ||
+ | *Submitted TEST SGTs on hpc to verify that v3.0.3 results on Kraken are good | ||
+ | *Submitted USC SGTs on kraken to get hazard curve | ||
+ | *Worked on direct calculation of UCVM in AWP format | ||
== Today == | == Today == | ||
− | * | + | *Run PP with AWP SGTs at USC |
− | *Monitor | + | *Monitor RWG TEST and USC SGT runs |
− | + | *Run tests of UCVM in AWP format | |
− | * | ||
== Blocked == | == Blocked == | ||
Line 13: | Line 16: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *Phil regarding CyberShake |
− | + | *CyberShake call | |
+ | *Email CyberShake papers to Liwen | ||
*Continue testing compiler optimizations | *Continue testing compiler optimizations | ||
*Run some I/O tests to get reference values | *Run some I/O tests to get reference values |
Revision as of 17:06, 19 September 2012
Yesterday
- AWP SGT jobs at USC finished
- Ran verification test with RWG v3.0.3, seeing ~10% differences
- Emailed Rob with test results and analysis of differences, Rob says expected
- Submitted TEST SGTs on hpc to verify that v3.0.3 results on Kraken are good
- Submitted USC SGTs on kraken to get hazard curve
- Worked on direct calculation of UCVM in AWP format
Today
- Run PP with AWP SGTs at USC
- Monitor RWG TEST and USC SGT runs
- Run tests of UCVM in AWP format
Blocked
- No
Follow-ups
- Phil regarding CyberShake
- CyberShake call
- Email CyberShake papers to Liwen
- Continue testing compiler optimizations
- Run some I/O tests to get reference values
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration