Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * Tested | + | * Tested Arias Duration implementation |
− | * | + | * Ran jbsim with different simulation windows |
− | * | + | ** Two parameters involved: ntout and maxnt |
− | + | * Compiled Norm's faster RotD50 code | |
− | * | + | * Call with RK, PM |
+ | * Ran LOMAP GP code | ||
== Today: == | == Today: == | ||
− | * Test | + | * Test new version of RotD50 code |
− | + | ** LOMAP GP and UCSB | |
− | * | ||
− | * | ||
* Work on BBToolbox integration | * Work on BBToolbox integration | ||
+ | * Broadband science call | ||
== Blocked: == | == Blocked: == | ||
Line 19: | Line 19: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Broadband science call @ 1pm |
− |
Revision as of 17:04, 20 September 2012
Contents
Yesterday:
- Tested Arias Duration implementation
- Ran jbsim with different simulation windows
- Two parameters involved: ntout and maxnt
- Compiled Norm's faster RotD50 code
- Call with RK, PM
- Ran LOMAP GP code
Today:
- Test new version of RotD50 code
- LOMAP GP and UCSB
- Work on BBToolbox integration
- Broadband science call
Blocked:
- No
Followups:
- Broadband science call @ 1pm