Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
| − | * Tested | + | * Tested new version of RotD50 code in the platform |
| − | * | + | ** Few changes to the Fortran code |
| − | * Ran | + | * Ran LOMAP GP and UCSB |
| − | ** | + | ** Results look fine with new RotD50 |
| − | * | + | * Checked everything into svn |
| − | * Call with | + | * Broadband science call |
| − | * | + | * Ran 50-realization LOMAP GP on HPCC |
| + | * Call with CG, what else is needed to finalize pipeline | ||
| + | ** Band-pass filter for bias plot | ||
| + | ** Another bias plot with station distance | ||
== Today: == | == Today: == | ||
| − | * | + | * Run 1-station 8.2 fling |
| − | ** | + | ** 100s window size |
| − | * | + | ** 150s window size |
| − | + | * Post 50-realization results | |
| + | * BBToolbox integration | ||
== Blocked: == | == Blocked: == | ||
| Line 20: | Line 24: | ||
== Followups: == | == Followups: == | ||
| − | * | + | * No |
Revision as of 16:47, 21 September 2012
Contents
Yesterday:
- Tested new version of RotD50 code in the platform
- Few changes to the Fortran code
- Ran LOMAP GP and UCSB
- Results look fine with new RotD50
- Checked everything into svn
- Broadband science call
- Ran 50-realization LOMAP GP on HPCC
- Call with CG, what else is needed to finalize pipeline
- Band-pass filter for bias plot
- Another bias plot with station distance
Today:
- Run 1-station 8.2 fling
- 100s window size
- 150s window size
- Post 50-realization results
- BBToolbox integration
Blocked:
- No
Followups:
- No