Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Tested Arias Duration implementation
+
* Tested new version of RotD50 code in the platform
* Exchanged e-mails with RG
+
** Few changes to the Fortran code
* Ran jbsim with different simulation windows
+
* Ran LOMAP GP and UCSB
** Two parameters involved: ntout and maxnt
+
** Results look fine with new RotD50
* Compiled Norm's faster RotD50 code
+
* Checked everything into svn
* Call with RK, PM
+
* Broadband science call
* Ran LOMAP GP code
+
* Ran 50-realization LOMAP GP on HPCC
 +
* Call with CG, what else is needed to finalize pipeline
 +
** Band-pass filter for bias plot
 +
** Another bias plot with station distance
  
 
== Today: ==
 
== Today: ==
  
* Test new version of RotD50 code
+
* Run 1-station 8.2 fling
** LOMAP GP and UCSB
+
** 100s window size
* Work on BBToolbox integration
+
** 150s window size
* Broadband science call
+
* Post 50-realization results
 +
* BBToolbox integration
  
 
== Blocked: ==
 
== Blocked: ==
Line 20: Line 24:
  
 
== Followups: ==
 
== Followups: ==
* Broadband science call @ 1pm
+
* No

Revision as of 16:47, 21 September 2012

Yesterday:

  • Tested new version of RotD50 code in the platform
    • Few changes to the Fortran code
  • Ran LOMAP GP and UCSB
    • Results look fine with new RotD50
  • Checked everything into svn
  • Broadband science call
  • Ran 50-realization LOMAP GP on HPCC
  • Call with CG, what else is needed to finalize pipeline
    • Band-pass filter for bias plot
    • Another bias plot with station distance

Today:

  • Run 1-station 8.2 fling
    • 100s window size
    • 150s window size
  • Post 50-realization results
  • BBToolbox integration

Blocked:

  • No

Followups:

  • No