Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* SI2 supplemental USC statement of work
+
* Posted CME files
* ALCF Call noon
+
* Reviewed SI2 proposal and data management plan
* CyberShake Call 11am
+
* BBP Call 2pm
* BBP Call 1:30pm
+
* Follow-up SAM meeting with Nadia and Illa
* install pynga on mac
+
* Confirm call with Ralph on server diffs for Monday 2pm
* SCEC Annual Meeting (SAM) follow-ups
 
* Meeting with Tom on SI2 proposal
 
* Follow-up with Scott
 
  
 
== Today: ==
 
== Today: ==
* Complete CME meeting presentations postings
 
* Write SI2 supplement data management plan
 
* BBP Call 2pm
 
 
* Schedule HighF call
 
* Schedule HighF call
* Respond to Nadia and Illa
 
 
* Edit CME section of RFP
 
* Edit CME section of RFP
 +
* Call with Christine on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
 +
* Distribute exsim configuration file to christine
 +
* Repost event file with updated Qp
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 17:
  
 
== Followups: ==  
 
== Followups: ==  
* No
+
*
  
 
== Pending: ==
 
== Pending: ==
*Call with Christine on site
+
*
*Call with Ralph on server diffs
 
*Feng email to Paul to help with validation part B
 
*Distribute exsim configuration file to christine
 
*Repost event file with updated Qp
 

Revision as of 17:10, 21 September 2012

Yesterday:

  • Posted CME files
  • Reviewed SI2 proposal and data management plan
  • BBP Call 2pm
  • Follow-up SAM meeting with Nadia and Illa
  • Confirm call with Ralph on server diffs for Monday 2pm

Today:

  • Schedule HighF call
  • Edit CME section of RFP
  • Call with Christine on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
  • Distribute exsim configuration file to christine
  • Repost event file with updated Qp

Blocked:

  • No

Followups:

Pending: