Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to search| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
| − | * | + | * Scheduled High-F call for 4 Oct |
| − | * | + | * Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration |
| − | + | * Reposted event file with updated Qp | |
| − | |||
| − | * | ||
== Today: == | == Today: == | ||
| − | * | + | * Meeting with JY on hypocenter posting, accts, and julL acct 11am |
| + | * Telecon with JC on ucsb method at 2pm | ||
* Edit CME section of RFP | * Edit CME section of RFP | ||
| − | |||
* Distribute exsim configuration file to christine | * Distribute exsim configuration file to christine | ||
| − | |||
== Blocked: == | == Blocked: == | ||
Revision as of 16:17, 24 September 2012
Contents
Yesterday:
- Scheduled High-F call for 4 Oct
- Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
- Reposted event file with updated Qp
Today:
- Meeting with JY on hypocenter posting, accts, and julL acct 11am
- Telecon with JC on ucsb method at 2pm
- Edit CME section of RFP
- Distribute exsim configuration file to christine
Blocked:
- No