Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Posted CME files
+
* Scheduled High-F call for 4 Oct
* Reviewed SI2 proposal and data management plan
+
* Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
* BBP Call 2pm
+
* Reposted event file with updated Qp
* Follow-up SAM meeting with Nadia and Illa
 
* Confirm call with Ralph on server diffs for Monday 2pm
 
  
 
== Today: ==
 
== Today: ==
* Schedule HighF call
+
* Meeting with JY on hypocenter posting, accts, and julL acct 11am
 +
* Telecon with JC on ucsb method at 2pm
 
* Edit CME section of RFP
 
* Edit CME section of RFP
* Call with Christine on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
 
 
* Distribute exsim configuration file to christine
 
* Distribute exsim configuration file to christine
* Repost event file with updated Qp
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:17, 24 September 2012

Yesterday:

  • Scheduled High-F call for 4 Oct
  • Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
  • Reposted event file with updated Qp

Today:

  • Meeting with JY on hypocenter posting, accts, and julL acct 11am
  • Telecon with JC on ucsb method at 2pm
  • Edit CME section of RFP
  • Distribute exsim configuration file to christine

Blocked:

  • No

Followups:

Pending: