Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 9: | Line 9: | ||
* Edit CME section of RFP | * Edit CME section of RFP | ||
* Distribute exsim configuration file to christine | * Distribute exsim configuration file to christine | ||
+ | * Sprint review and spring planning with FS | ||
== Blocked: == | == Blocked: == |
Revision as of 16:35, 24 September 2012
Contents
Yesterday:
- Scheduled High-F call for 4 Oct
- Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
- Reposted event file with updated Qp
Today:
- Meeting with JY on hypocenter posting, accts, and julL acct 11am
- Telecon with JC on ucsb method at 2pm
- Edit CME section of RFP
- Distribute exsim configuration file to christine
- Sprint review and spring planning with FS
Blocked:
- No