Difference between revisions of "Broadband Sprints"
From SCECpedia
Jump to navigationJump to searchLine 36: | Line 36: | ||
|3 || Develop scripts to run bbp on cluster || 5 || 95 || 4.75 | |3 || Develop scripts to run bbp on cluster || 5 || 95 || 4.75 | ||
|- | |- | ||
− | | || Total Sprint Velocity || || || 9.25 | + | | || Total Sprint Velocity || 13|| || 9.25 |
|} | |} | ||
Revision as of 19:53, 24 September 2012
Development targets, Trac Tickets, and other activities related to Broadband Platform development
Sprint 7
- Sprint Dates: 24 Sept - 5 Oct
Priority | Sprint Task | Estimated LOE | % Completed | Earned Value |
---|---|---|---|---|
1 | Integration of the new bbtoolbox model | 5 | 30 | 0 |
2 | Modeler access to cluster | 1 | 10 | 0 |
3 | Release candidate distribution for v12.10 | 3 | 0 | 0 |
4 | Install bbp software usable on server and cluster | 3 | 0 | 0 |
5 | Data products list generated for validation runs | 2 | 0 | 0 |
6 | Calculate SI2 BBP Metrics | 1 | 0 | 0 |
7 | BBP input to EXSIM input config generator | 2 | 0 | 0 |
Total Sprint Velocity | 0 |
Sprint 6
- Sprint Dates: 10 Sept - 21 Sept
Priority | Sprint Task | Estimated LOE | % Completed | Earned Value |
---|---|---|---|---|
1 | Implementation of the Arias duration GOF plots | 3 | 100 | 3.00 |
2 | Integration of new bbtoolbox model | 5 | 30 | 1.50 |
3 | Develop scripts to run bbp on cluster | 5 | 95 | 4.75 |
Total Sprint Velocity | 13 | 9.25 |
Sprint 5
- Sprint Dates - 27 August - 7 Sept
- Calculate velocity profiles (Vp,Vs,rho) for all California validation events
- Configure bbp to run on server or cluster
- Add Arias duration into validation pipeline
- Add Site Correction Module into validation pipeline
- End-to-end validation pipeline with both obs and sim processing
- Integrate new bbtoolbox codes into pipeline
- Configure UCSB and SDSU methods to run LOMAP
- Fill out 6 panel bias plots based on 3 methods running on server and cluster
- Install bbp software usable on server and cluster
- Prepare Broadband 12.8.0 Release, including:
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 4
- Sprint Dates - 13 August - 24 August
- Calculate velocity profiles for Landers and Hector Mine station sites
- Configure UCSB and SDSU methods to run LOMAP
- Post bias plots for LOMAP for 3 main methods on server and on cluster
- Add method that raises uncatchable exception to bbp_utils to identify unexpected conditions
- Add arias duration into validation pipeline
- Add rotd50 into validation pipeline
- Check rotd50 results from platform against results from CG
- Add site correction module to process observed seismograms
- Add observation data processing into validation pipeline
- End-to-end validation pipeline with both obs and sim processing.
- Data products list generated for validation runs.
- Make site response processing optional for validation runs
- Update GP codebase with compiler changes
- Prepare Broadband 12.8.0 Release
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 3
- Sprint Dates: 30 July - 10 August
- Routine plotting of LOMAP full validation with comparison acceleration plots (with fixed label), and Bias GOF plots for LOMA Prieta
- LOMAP workflow changed to include rupture generator
- Wiki site updated to contain current input files, current GOF, and example comparison plots
- URS modules renamed to GP
- Documentation on how to setup new GF and validation data
- DB code and PEER formatter included in trunk
- Rupture generator parameters separated into user selectable (), and modeler adjustable (DLEN, DWID, DT)
- ROTD50 running with acceptance test and producing file as part of LOMAP
- ARIAS running with acceptance test and producing file as part of LOMAP
- Integrate new bbtoolbox into platform
Sprint 2
- Sprint Dates: 16 July - 27 July
Sprint Task | Estimated LOE | % Completed |
---|---|---|
Change validation processing so users specify a velocity model, which then determines the GF used in processing, removing "region" based GF selection in bbp v11.2.3. | 10 | 100 |
Sprint 1
- Sprint Dates: 2 July - 13 July
Sprint Task | Estimated LOE | % Completed |
---|---|---|
Separate Validation Data from BBP software distribution so observational data sets are not distributed as part of BBP software | 10 | 100 |