Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Checked BBToolbox parameters
+
* Continued working on BBToolbox integration
** Updated few parameters in Northridge validation package
+
** Different ways to handle scenario and validation simulations
* Broadband Science call
+
* Using 12.0 Fortran compilers, ran comparison between cluster and broadband
 +
** GP LOMAP 100% same
 +
** UCSM LOMAP 100% same
 +
* "source /usr/usc/intel/12.0/setup.csh"
 +
** Needed to compile code
 +
** Not wanted to RUN code
 +
** unsetenv LD_LIBRARY_PATH fixes problem
 +
* Created new tickets
  
 
== Today: ==
 
== Today: ==
  
* Continue working on BBToolbox
+
* Continue integrating BBToolbox into BBP
** Integrate updated parameter files from Rumi into the platform (Northridge)
+
* Run 50-realization UCSB on HPCC
** Test end-to-end runs, send results to Rumi
 
* Change Python scripts to derive sdsu station list from official station list
 
* Add fmax as configurable parameter
 
* Run BBToolbox inside platform
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:25, 2 October 2012

Yesterday:

  • Continued working on BBToolbox integration
    • Different ways to handle scenario and validation simulations
  • Using 12.0 Fortran compilers, ran comparison between cluster and broadband
    • GP LOMAP 100% same
    • UCSM LOMAP 100% same
  • "source /usr/usc/intel/12.0/setup.csh"
    • Needed to compile code
    • Not wanted to RUN code
    • unsetenv LD_LIBRARY_PATH fixes problem
  • Created new tickets

Today:

  • Continue integrating BBToolbox into BBP
  • Run 50-realization UCSB on HPCC

Blocked:

  • No

Followups:

  • No