Difference between revisions of "Broadband Sprints"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
== Create BBP v12.10 Distribution == | == Create BBP v12.10 Distribution == | ||
− | #Confirm SDSU results | + | #Confirm SDSU results (cvm used,default kappa value,fault geom file) |
#Confirm GP, UCSB, SDSU work on server and HPCC | #Confirm GP, UCSB, SDSU work on server and HPCC | ||
#Complete data product improvements like using RotD50 not avg horizontal | #Complete data product improvements like using RotD50 not avg horizontal | ||
#Update User Guide | #Update User Guide | ||
− | #Tag distribution | + | #Tag distribution with version number |
#Update manifest in distribution | #Update manifest in distribution | ||
#Compile list of Broadband data products | #Compile list of Broadband data products |
Revision as of 23:37, 8 October 2012
Development targets, Trac Tickets, and other activities related to Broadband Platform development. In these planning, Level of Effort (LOE) is defined in days.
Contents
Create BBP v12.10 Distribution
- Confirm SDSU results (cvm used,default kappa value,fault geom file)
- Confirm GP, UCSB, SDSU work on server and HPCC
- Complete data product improvements like using RotD50 not avg horizontal
- Update User Guide
- Tag distribution with version number
- Update manifest in distribution
- Compile list of Broadband data products
Sprint 7
- Sprint Dates: 24 Sept - 5 Oct
Priority | Sprint Task | Estimated LOE | % Completed | Vel. Pts |
---|---|---|---|---|
1 | Integration of the new bbtoolbox model | 5 | 80 | 4.0 |
2 | Modeler access to cluster | 1 | 10 | 0.1 |
3 | Release candidate distribution for v12.10 | 3 | 10 | 0.3 |
4 | Match simulation results between server and cluster | 2 | 66 | 1.3 |
5 | Generate first set of 50 realizations for LOMAP | 2 | 66 | 1.3 |
6 | Install bbp software usable on server and cluster | 3 | 0 | 0 |
7 | Data products list generated for validation runs | 2 | 0 | 0 |
8 | Calculate SI2 BBP Metrics | 1 | 10 | 0.1 |
9 | BBP input to EXSIM input config generator | 2 | 10 | 0.2 |
10 | Use low and high frequency limits on bias plots | 2 | 100 | 2 |
11 | Use RotD50 data on bias plot | 2 | 50 | 1 |
Total Sprint Velocity | 19 | 10.3 |
Sprint 6
- Sprint Dates: 10 Sept - 21 Sept
Priority | Sprint Task | Estimated LOE | % Completed | Vel Pts |
---|---|---|---|---|
1 | Implementation of the Arias duration GOF plots | 3 | 100 | 3.00 |
2 | Integration of new bbtoolbox model | 5 | 30 | 1.50 |
3 | Develop scripts to run bbp on cluster | 5 | 95 | 4.75 |
Total Sprint Velocity | 13 | 9.25 |
Sprint 5
- Sprint Dates - 27 August - 7 Sept
- Calculate velocity profiles (Vp,Vs,rho) for all California validation events
- Configure bbp to run on server or cluster
- Add Arias duration into validation pipeline
- Add Site Correction Module into validation pipeline
- End-to-end validation pipeline with both obs and sim processing
- Integrate new bbtoolbox codes into pipeline
- Configure UCSB and SDSU methods to run LOMAP
- Fill out 6 panel bias plots based on 3 methods running on server and cluster
- Install bbp software usable on server and cluster
- Prepare Broadband 12.8.0 Release, including:
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 4
- Sprint Dates - 13 August - 24 August
- Calculate velocity profiles for Landers and Hector Mine station sites
- Configure UCSB and SDSU methods to run LOMAP
- Post bias plots for LOMAP for 3 main methods on server and on cluster
- Add method that raises uncatchable exception to bbp_utils to identify unexpected conditions
- Add arias duration into validation pipeline
- Add rotd50 into validation pipeline
- Check rotd50 results from platform against results from CG
- Add site correction module to process observed seismograms
- Add observation data processing into validation pipeline
- End-to-end validation pipeline with both obs and sim processing.
- Data products list generated for validation runs.
- Make site response processing optional for validation runs
- Update GP codebase with compiler changes
- Prepare Broadband 12.8.0 Release
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 3
- Sprint Dates: 30 July - 10 August
- Routine plotting of LOMAP full validation with comparison acceleration plots (with fixed label), and Bias GOF plots for LOMA Prieta
- LOMAP workflow changed to include rupture generator
- Wiki site updated to contain current input files, current GOF, and example comparison plots
- URS modules renamed to GP
- Documentation on how to setup new GF and validation data
- DB code and PEER formatter included in trunk
- Rupture generator parameters separated into user selectable (), and modeler adjustable (DLEN, DWID, DT)
- ROTD50 running with acceptance test and producing file as part of LOMAP
- ARIAS running with acceptance test and producing file as part of LOMAP
- Integrate new bbtoolbox into platform
Sprint 2
- Sprint Dates: 16 July - 27 July
Priority | Sprint Task | Estimated LOE | % Complete | Vel. Pts |
---|---|---|---|---|
1 | Change validation processing so users specify GF used in processing | 10 | 100 | 10 |
Total Sprint Velocity | 10 | 10 |
Sprint 1
- Sprint Dates: 2 July - 13 July
Priority | Sprint Task | Estimated LOE | % Complete | Vel. Pts |
---|---|---|---|---|
1 | Separate Validation Data from BBP software distribution | 10 | 100 | 10.0 |
Total Sprint Velocity | 10 | 10.0 |