Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
* Worked on ExSim integration
 
* Worked on ExSim integration
−
** Checked ExSim into SVN
+
** Got reply from KA about parameters, made few adjustments
−
** Migrated converter.for program to Python
+
** Write complete ExSim parameter file
−
** Worked on script to write ExSim's configuration file
+
** Invokes ExSim
−
* Got North Palm Springs, Tottori, and Niigata event files from CG
+
** Looks at results
−
* Matlab is working again
+
** Modified ExSim's frequencies to match the 63 periods expected in the platform
  
 
== Today: ==
 
== Today: ==
  
 
* Continue ExSim integration
 
* Continue ExSim integration
−
** Start ExSim, reformat output files
+
** Reformat output files into RotD50 files
 
** Create XML file to run ExSim within the Platform
 
** Create XML file to run ExSim within the Platform
−
** Still waiting for KA's reply
 
 
* Check into svn GMPE code
 
* Check into svn GMPE code
 +
* Create North Palm Springs Validation package
  
 
== Blocked: ==
 
== Blocked: ==
Line 20: Line 20:
  
 
== Followups: ==
 
== Followups: ==
−
* No
+
* Cybershake call @ 11am

Revision as of 17:57, 6 February 2013

Yesterday:

  • Worked on ExSim integration
    • Got reply from KA about parameters, made few adjustments
    • Write complete ExSim parameter file
    • Invokes ExSim
    • Looks at results
    • Modified ExSim's frequencies to match the 63 periods expected in the platform

Today:

  • Continue ExSim integration
    • Reformat output files into RotD50 files
    • Create XML file to run ExSim within the Platform
  • Check into svn GMPE code
  • Create North Palm Springs Validation package

Blocked:

  • No

Followups:

  • Cybershake call @ 11am