Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 16: Line 16:
 
**Set up with AWP
 
**Set up with AWP
 
*Kraken:
 
*Kraken:
 +
**Investigate OOM failures with new workflows
 
**Error on PP with Blue Waters AWP WNGC SGTs; investigate
 
**Error on PP with Blue Waters AWP WNGC SGTs; investigate
 
*Update Pegasus to get new output-dir
 
*Update Pegasus to get new output-dir
Line 21: Line 22:
 
*Add AWP helper scripts to DAX generator
 
*Add AWP helper scripts to DAX generator
 
*Email cybershake list to notify about CS Study 2.3 site list
 
*Email cybershake list to notify about CS Study 2.3 site list
 +
 
== Blocked ==
 
== Blocked ==
 
*No
 
*No

Revision as of 18:18, 25 February 2013

Yesterday

  • Blue Waters:
    • Ran post-AWP scripts
    • Finished defining workflow-generating scripts
  • Stampede:
    • Continued testing PP with different combinations of widths and number of DAXes
  • Kraken:
    • Submitted WNGC AWP SGTs from BW
    • Configure forward RWG simulation

Today

  • Blue Waters:
    • Test workflow-generating scripts
  • Stampede:
    • Continue testing PP configurations
    • Set up with AWP
  • Kraken:
    • Investigate OOM failures with new workflows
    • Error on PP with Blue Waters AWP WNGC SGTs; investigate
  • Update Pegasus to get new output-dir
  • Prepare and travel for Blue Waters workshop
  • Add AWP helper scripts to DAX generator
  • Email cybershake list to notify about CS Study 2.3 site list

Blocked

  • No

Follow-ups

  • Nico at 11
  • Jessica at 12

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration