Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
 
*Blue Waters:
 
*Blue Waters:
**Ran post-AWP scripts
+
**Tested workflow-generating scripts
**Finished defining workflow-generating scripts
+
**Tried out performance monitoring tools, useful
 
*Stampede:
 
*Stampede:
**Continued testing PP with different combinations of widths and number of DAXes
+
**Continued testing PP configurations
 
*Kraken:
 
*Kraken:
**Submitted WNGC AWP SGTs from BW
+
**Investigated OOM failures with new workflows -- just needed MPI_Finalize(), return 0
**Configure forward RWG simulation
+
**Error on PP with Blue Waters AWP WNGC SGTs; investigated, found bug in
 +
*Updated Pegasus to get new output-dir
 +
*Emailed cybershake list to notify about CS Study 2.3 site list
 +
*Blue Waters workshop at NCSA
  
 
== Today ==
 
== Today ==
 
*Blue Waters:
 
*Blue Waters:
**Test workflow-generating scripts
+
**Modify workflow-generating scripts to generate all 4 SGT sets at once
*Stampede:
+
**Wait on post-processing results from WNGC
**Continue testing PP configurations
+
*Stampede
 
**Set up with AWP
 
**Set up with AWP
*Kraken:
+
**Test with fewer #s of DAXes
**Investigate OOM failures with new workflows
+
*Kraken
**Error on PP with Blue Waters AWP WNGC SGTs; investigate
+
**Run forward simulation
*Update Pegasus to get new output-dir
+
**Run post-processing for BW AWP WNGC SGTs
*Prepare and travel for Blue Waters workshop
 
 
*Add AWP helper scripts to DAX generator
 
*Add AWP helper scripts to DAX generator
*Email cybershake list to notify about CS Study 2.3 site list
+
*Draft request for GRAM remote job submission to Blue Waters
 +
*Put Blue Waters #s on wiki
  
 
== Blocked ==
 
== Blocked ==
Line 27: Line 30:
  
 
== Follow-ups ==  
 
== Follow-ups ==  
*Phil after the call
+
*Phil, potentially
*Nico at 11
+
*David, after call
*Jessica at 12
 
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:35, 1 March 2013

Yesterday

  • Blue Waters:
    • Tested workflow-generating scripts
    • Tried out performance monitoring tools, useful
  • Stampede:
    • Continued testing PP configurations
  • Kraken:
    • Investigated OOM failures with new workflows -- just needed MPI_Finalize(), return 0
    • Error on PP with Blue Waters AWP WNGC SGTs; investigated, found bug in
  • Updated Pegasus to get new output-dir
  • Emailed cybershake list to notify about CS Study 2.3 site list
  • Blue Waters workshop at NCSA

Today

  • Blue Waters:
    • Modify workflow-generating scripts to generate all 4 SGT sets at once
    • Wait on post-processing results from WNGC
  • Stampede
    • Set up with AWP
    • Test with fewer #s of DAXes
  • Kraken
    • Run forward simulation
    • Run post-processing for BW AWP WNGC SGTs
  • Add AWP helper scripts to DAX generator
  • Draft request for GRAM remote job submission to Blue Waters
  • Put Blue Waters #s on wiki

Blocked

  • No

Follow-ups

  • Phil, potentially
  • David, after call

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration